EuroBlastTech
Equipment Maintenance

Shot Blast Chamber Liner Installation Guide

Chamber liners protect blast chamber shell from shot impact wear. This guide covers liner selection, installation methods and maintenance tips.

Technical Team 2026-04-28

Need professional selection advice?

Contact Us

Liner Types

By Material

Material Hardness Life Application
High-chromium cast iron HRC 55-60 Long High impact areas
Alloy steel HRC 45-50 Medium General areas
Rubber - Short Low impact areas

By Shape

  • Flat liner: Standard size, versatile
  • Custom liner: Special shape, equipment-specific
  • Modular liner: Modular design, easy replacement

Selection Points

Position Selection

Position Recommended Reason
Opposite blaster High-chromium Direct impact, maximum wear
Side walls Alloy steel Indirect impact, medium wear
Bottom High-chromium Shot accumulation, continuous wear
Top Alloy steel/Rubber Minimal impact

Thickness Selection

  • General areas: 10-15mm
  • High impact areas: 20-30mm
  • Special needs: Customizable

Installation Steps

Preparation

  1. Clean mounting surface
  2. Check liner size match
  3. Prepare tools and fasteners

Installation Process

  1. Positioning

    • Position per design drawing
    • Ensure liner flat fit
    • Check adjacent liner gaps
  2. Fixing

    • Use bolts or welding
    • Ensure firm fixation
    • Check fastener distribution
  3. Inspection

    • Confirm liner installed correctly
    • Check fastener tightness
    • Test run observation

Maintenance Points

Regular Check

  • Quarterly wear inspection
  • Focus on high impact areas
  • Record wear condition

Replacement Standards

Check Item Replace Standard
Thickness wear ≥50% original thickness
Surface crack Visible crack or damage
Fixation loose Cannot re-tighten
Edge lifting Visible deformation

Replacement Tips

  • Single or combined replacement
  • Check adjacent liners when replacing
  • Recommend backup inventory

Safety Notes

  1. Ensure equipment powered off before installation
  2. Use qualified tools and safety equipment
  3. Heavy liners, handle with care
    4.高空作业做好防护

Procurement Tip: We offer various liner specifications, high-chromium cast iron material, excellent wear resistance, customizable size and shape.

Tags: 护板安装抛丸室维护

Need More Technical Support?

Our technical team can provide professional selection advice and process optimization solutions